L-PDl U
9-5. Reassembly
9-5-l. Reassembly in side of the main chassis.
Note) Numbers before part names are given as a guide to the order of assemblv.
As for greasing/oiling/cleaning places refer to the attached drawings (1 akd 2).
Side surface grease
(2) Pinch drive lever
Shaft grease
Main chassis
assembly (Front surface)
(2) Mechanism fixing angle
B-4
Item
Tightening torque Quantity
assembly (Rear surface)
7
70mN-m
3
I
A 9 S Tight . Ml .4 x L3
B 9 S Tight . Ml .4 x L2
70mN.m
6
se to the cam groove.
Note) The numbers following A and B
indicate the screw tightening order.
Main chassis assembly (Rear surface)
9-6