EasyManua.ls Logo

Sharp VL-SD20U

Sharp VL-SD20U
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VL-SDPOU
GREASE/OIL APPLICATION
Fig. 1. Side of the main chassis
Fig. 3. Side of the slide chassis
@Brake shifter
@ : Greasing
q : Greasing
@@Pinch lever
Fig. 4. Side of the slide chassis
@Pinch control lever
@Intermediate gear angle
From rear
ace side
rom rear
surfaceside
@Main cam
7
G
7
@S loading arm
@Tu loading arm
000
fil!lB
-ii
00: 0
0 00
0
0
@Loading lever
arc==@
@Drum base assembly @ITu guide cam @T arm control lever
Fig. 2. Side of the main chassis
r I
I
@Swing arm
6 @:Oiling 1
I
Fig. 5. After joining the main chassis and slide chassis
Part A
9-6. Removing the cassette
(1) Apply DC3V to the loading motor unload slightly.
(2) After the tape is slackened, turn the rotor (lower side of mechanism)
of capstan motor to tighten the tape. (Arrow direction, Fig. 1)
(3) Repeat the operations (1) and (2). After the pole base has been
completely unloaded, ascertain that the tape is not loose.
(4) Finally apply again DC3V to the loading motor, so that the cassette
controller ejects.
(5) Take out the cassette.
Note) DC3V is applied to the loading motor as shown below. Then,
the mechanism moves in the unloading direction.
Fig. 6. Sensor FPC wiring
Capstan motor rotor rotation direction
(from rear side of mechanism)
Min’f’ pole Loading motor
/
PIUS p
Fig. 1
9-7

Related product manuals