54
Maintenance
Charging of the satellite system ON/OFF switch
(2) Connect the PC linkage device and the PC.
Electric wire of satellite system ON/OFF switch
(2)
(1)
Junction [B] SM-JC40 / SM-JC41 / SM-JC200 (EW-SD50 type) EW-JC304 (EW-SD300 type)
PC linkage device
SM-PCE1 / SM-PCE02
NOTICE
• It is necessary to connect the satellite system ON/OFF switch and PC linkage
device via junction [B] as shown in the figure.
• When connecting a device compatible with the EW-SD300 to the PC linkage
device, use a conversion adapter (EW-AD305) to connect the wire to the EW-
SD50.
• The drive unit and satellite system ON/OFF switch may be connected via junction
[B], depending on the bicycle. When connecting to junction [B], remove the
electric wire connected to the drive unit from junction [B].
3. Start E-TUBE PROJECT.
If E-TUBE PROJECT for Windows is version 3.4.3
Execute [Connection check].
• Charging of the built-in battery starts when the satellite system ON/OFF switch is
detected.
• The LED lamp on the satellite system ON/OFF switch flashes while charging. When
charging is complete, the LED turns off.