EasyManua.ls Logo

Shimano Steps BT-E6000 - Page 54

Shimano Steps BT-E6000
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
Maintenance
Charging of the satellite system ON/OFF switch
(2) Connect the PC linkage device and the PC.
Electric wire of satellite system ON/OFF switch
(2)
(1)
Junction [B] SM-JC40 / SM-JC41 / SM-JC200 (EW-SD50 type) EW-JC304 (EW-SD300 type)
PC linkage device
SM-PCE1 / SM-PCE02
NOTICE
It is necessary to connect the satellite system ON/OFF switch and PC linkage
device via junction [B] as shown in the figure.
When connecting a device compatible with the EW-SD300 to the PC linkage
device, use a conversion adapter (EW-AD305) to connect the wire to the EW-
SD50.
The drive unit and satellite system ON/OFF switch may be connected via junction
[B], depending on the bicycle. When connecting to junction [B], remove the
electric wire connected to the drive unit from junction [B].
3. Start E-TUBE PROJECT.
If E-TUBE PROJECT for Windows is version 3.4.3
Execute [Connection check].
Charging of the built-in battery starts when the satellite system ON/OFF switch is
detected.
The LED lamp on the satellite system ON/OFF switch flashes while charging. When
charging is complete, the LED turns off.

Other manuals for Shimano Steps BT-E6000

Related product manuals