EasyManua.ls Logo

Side-Power SR 100/185 T - S-link System Planning and Routing; Planning the Backbone Cable Route; Spur Cable Installation and Protection

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
SR80/185T - SR100/185T 1.0.0 - 2009
Example of the control wiring with S-link system for boats with
one control position and one retractable thruster.
S1=_____
pos & neg
and ground
BB1=___
BB2=___
S2=_____
You need:
2 x 6 1327 End terminators
3 x 6 1326 T-connectors
1 x 6 1328 Power spur
2 x 6 1320-xxM Backbone cables
2 x 6 1321-xxM Spur cables
N
GB
S-link planlegging og forbehold
S-link planning & precautions
Routing the Backbone:
Plan routing of the backbone so that lenght of spur cables will be kept at
a minimum.
Avoid routing the S-link cables close to equipment that might cause
interference to the S-link signals, such as radio transmitter equipment,
antennas, high voltage cables etc.
The backbone MUST be terminated in each end with the 6 1327 End
Terminator.
Spur cables:
Spur cables can be left unterminated (i.e. routing can be prepared for
future additional equipment), make sure to protect open connectors from
water and moisture to avoid corrosion in connector .
Ruting av Backbone:
3ODQOHJJOHJJLQJHQDY³EDFNERQH´NDEHOHQVOLNDWOHQJGHQHSn³VSXU´ND-
blene blir kortest mulig.
8QQJnnOHJJH6OLQNNDEHOHQHLQUKHWHQDYOHGQLQJHUHOOHUXWVW\UVRP
kan skape forstyrrelser for S-link signalene, slik som radiosendere, anten-
ner, høyspentkabler etc.
³%DFNERQH´NDEHOHQ0cWHUPLQHUHVLEHJJHHQGHUPHG³7HUPLQD-
WRUSOXJJ´
Spur kabler:
³6SXU´NDEOHUNDQNREOHVWLO³EDFNERQH´NDEHOHQXWHQnWHUPLQHUHVIHNV
IRUNODUJM¡ULQJDYIUHPWLGLJWLOOHJJVXWVW\UV¡UJIRUIRUnEHVN\WWHGHnSQH
NRQWDNWHQHIUDIXNWIRUnIRUKLQGUHNRUURVMRQLNRQWDNWHQ
Positive, Negative
& Shield

Related product manuals