EasyManua.ls Logo

Sideshift SS Series - Installation Overview

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIDESHIFT INSTALLATION GUIDE V2.7
16
INSTALLATION OVERVIEW
Thruster installation involves three main phases: thruster mounting, joystick and
electrical installation.
There are differences between installing a bow thruster and a stern thruster,
although they share many common elements. Instructions for each type of
installation are covered separately below.
Electrical installation and joystick installation are similar for bow and stern thrusters.
Each is covered in a separate section.
Note that if you are installing both a bow and stern thruster, each thruster must
have a separate electrical installation, including batteries, motor controller and
joystick receiver. They can share a dual joystick which has two joysticks on a single
console, or use two separate single joysticks.