Place a generous amount of supplied threadlocker on the threads and in
the hole of each bolt. It is important that all thread and hole surfaces
are well covered with threadlocker to prevent corrosion of the hardware
and cavitation plate and to enable easy removal in the future.
Ensure that there is adequate cable clearance to compensate for movement of the
motor or I/O side to side and vertically. On some engines the thruster cables can be
routed through the engine cover. See examples of various methods below.