EasyManua.ls Logo

sidhil Artemis - CPR Dial and Control Unit Placement; Air Hose and Cable Connections; Initial Inflation Process

sidhil Artemis
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
• Ensure the CPR dial is rotated to a vertical or horizontal, and closed, position.
• Position the control unit by hanging the hooks over the foot board. If there is no
foot board place the unit on the floor with the front facing upwards. Ensure the
rear of the unit is not obstructed by carpet, rugs etc. It is advisable to place the
unit on a firm surface.
• Attach the air connector to the control unit, ensuring the air hose does not kink
or become trapped between parts of the bedframe.
• Route the mains cable down the length of the mattress using the integral routing
sheath. Detach the pop studs from the sheath, insert the cable and reattach all
the studs down the full length of the sheath.
• Plug the mains cable into a suitable mains supply and switch on the control unit
(see section 9).
• The mattress system will start to inflate. Inflation will be complete within 20
minutes.
CPR Closed:CPR Open:

Other manuals for sidhil Artemis

Related product manuals