EasyManuals Logo

Siemens CP 342-5 User Manual

Siemens CP 342-5
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Diagnostics and upkeep
5.1 Loading firmware
CP 342-5 / CP 342-5 FO
40 Manual, 07/2017, C79000-G8976-C146-10
4. Check the configuration of the PG/PC.
Click the "Modify" button to set the access point of the application and the interface
parameter assignment in the "Set PG/PC Interface" diaöog.
The "Set PG/PC interface" dialog opens.
Make the following settings for the access point of the application and the interface
parameter assignment of the PC CP:
CP 342-5 (5DA03): FWL_FAST_LOAD
This profile "FWL_FAST_LOAD" is supported as of SIMATIC STEP 7 V5.5 SP1.
CP 342-5 FO (5DF00): FWL
Confirm the changes with "OK".
5. Check the settings.
Click "Next".
The Firmware Loader opens the dialog "Step 4".
6. Note the specifications of point 1 ... 6 in the dialog for step 4 of the Firmware Loader!
7. If the station is prepared according to the instructions, start loading with the "Download"
button.
You can follow the loading of the firmware file with the LED pattern of the CP, see section
LED displays (Page 29).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CP 342-5 and is the answer not in the manual?

Siemens CP 342-5 Specifications

General IconGeneral
BrandSiemens
ModelCP 342-5
CategoryConference System
LanguageEnglish

Related product manuals