Appendix B: Hematek Preservice Checklist, Page B—1
Appendix B: Hematek Preservice Checklist
For reference, record the following information.
Instrument Serial Number
Installation Date
Yes No
Has Section 7, Troubleshooting, been reviewed?
In the unit plugged into a live AC electrical outlet?
Does the
POWER light illuminate when the power switch is ON?
Has the line fuse been checked and replaced if defective?
Is the slide drying system operating properly?
Are the conveyor spirals operating?
Is the
LOW STAIN light operating properly?
Do all three stations pump reagent properly?
Do all stations pump reagent at the proper time?
Is the instrument level?
Has the platen been cleaned each day?
Has the stain tubing been cleaned each day?
Are the sensing fingers properly adjusted?
When was the pump tubing last changed?
When was the underplaten tubing last
changed?
Stain:
Buffer/Rinse:
Stain Pak Information (Check one) Wright’s Wright-Giemsa
Lot #: Exp. Date:
Give a brief description of the problem: