EasyManua.ls Logo

Siemens Maxum Edition II

Siemens Maxum Edition II
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Maxum Edition II
PD PA AP
Installation Manual
Installation Manual
General guidelines for receiving, unpacking, and
installing the Maxum Edition II gas chromatograph.
General initial startup procedures are given. Actual
practice is application dependent.
12/2019
2000595 Rev 1
Installation Overview
1
Safety notes
2
Installation Steps
3
Initial Startup Procedures
4
Appendix A - PECM LED
Interpretation
A
Appendix B - Change Log
B

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Siemens Maxum Edition II and is the answer not in the manual?

Siemens Maxum Edition II Specifications

General IconGeneral
ModelMaxum Edition II
TypeProcess Gas Chromatograph
Oven Temperature RangeAmbient +5 °C to 450 °C
Oven Temperature ProgrammingMultiple ramps and holds
Maximum Number of Detectors4
Maximum Number of Inlets4
Data AcquisitionIntegrated data acquisition system
Power Supply100-240 VAC, 50/60 Hz
Detector TypesFID, TCD, FPD, PDHID
CommunicationEthernet, Modbus, Profibus
Communication InterfaceEthernet
Dimensions (W x D x H)600 mm x 600 mm x 800 mm (approximate)
Number of ChannelsUp to 4 independent channels
WeightVaries with configuration

Summary

Installation Overview

Safety notes

Read the Safety Manual First

Guidance on reviewing the safety manual before installation.

Analyzer Environment

Requirements for the analyzer's location and operating temperature.

Hazardous Gasses

Safety considerations for hazardous gas presence during installation and operation.

Location

Guidelines for selecting a suitable installation location and enclosure.

Security information

Information on industrial security functions and best practices.

Approved Use

Details on the intended applications and safe usage of the Maxum II.

Qualified Personnel

Definition and requirements for personnel operating or maintaining the Maxum II.

Installation Steps

Custom Application Drawing Package

Information about the custom drawing package for specific analyzer details.

Considerations for Pulsed Discharge Detector Installation

Special installation requirements for PD detectors.

Receiving a Crated Analyzer

Procedures for inspecting and handling the analyzer upon arrival.

Mounting the Analyzer

Step-by-step guide for securely mounting the analyzer.

Cable Connections

Instructions for connecting power and signal cables to the analyzer.

Utility Gas Supply Installation

Requirements for installing carrier, calibration, fuel, and air gas supplies.

Sampling System Installation

Guidelines for installing the sample conditioning system.

Final Analyzer Connections

Procedures for making final connections to the analyzer.

Initial Startup Procedures

Inspect the Electronics Cabinet

Guide to verifying connections within the electronic enclosure.

Preparing and Inspecting the Oven

Steps for preparing and inspecting the analyzer's oven.

Establish Utility Gas Flows

Procedure for setting up and verifying utility gas flows.

Enable Power to the Maxum II

Steps to safely power up the analyzer system.

Leak Check the Column Oven Connections

Procedure for detecting and fixing leaks in oven connections.

Check Operation of Oven Heaters

Verifying the proper function of the oven heating system.

Check Flows and Pressures at Operating Temperature

Procedure to check gas flows and pressures under operating conditions.

Prepare Flame Detectors if Present

Steps to prepare and ignite flame detectors.

Establish Sample Flow to the Maxum II

Process for setting up and verifying sample flow to the analyzer.

Establish Communications with GCP

Guide to establishing communication between the analyzer and GCP.

Run Chromatograms and Make Method Adjustments if Necessary

Running chromatograms and adjusting method parameters.

Calibrate the Maxum II

Following instructions to calibrate the Maxum II analyzer.

Run the Maxum II on Process Fluid

Procedure to operate the analyzer using process fluid.

Check for Proper Reporting of Results

Verifying that the analyzer reports results correctly.

Appendix A - PECM LED Interpretation

Appendix B - Change Log

December 2019 Changes

List of changes made in the December 2019 update.

Related product manuals