$QDO\]HU
)URQW
)RDPFXVKLRQ
)RDPFXVKLRQ
&UDWHOLG
:RRGHQ[VXSSRUW
3O\ZRRG
VKLSSLQJ
PRXQW
IORDWLQJ
5HPRYHVFUHZV
WRUHOHDVH
ZRRGHQ
VXSSRUWDQG
IRDP
5HPRYHVFUHZVWRUHOHDVH
ZRRGHQVXSSRUWDQGIRDP
&UDWHVLGHFDQEHUHPRYHG
&UDWHVLGHFDQEHUHPRYHG
5HPRYHQXWV
WRUHPRYH
DQDO\]HUIURP
SO\ZRRG
VKLSSLQJ
PRXQW
5HPRYHQXWV
WRUHPRYH
DQDO\]HUIURP
SO\ZRRG
VKLSSLQJ
PRXQW
)RUNOLIWVORWV
Figure 3-2 Uncrating Details
CAUTION
Do not use protruding equipment as lifting handles.
The Maxum II must be lifted only by the mounting brackets on the back. Never allow the
analyzer to be supported on its side or front. Lifting by applying force on any of the equipment
protruding from the analyzer will damage the equipment.
● Remove the Maxum II from the shipping crate.
● Remove the plastic bag and drying agent from around the analyzer.
● Examine the Maxum II for visible damage. Notify the carrier of the damage and file the
necessary claims. Also notify your Siemens representative or authorized agent of the
damage to the equipment.
● The analyzer is likely to be shipped with packing material to help stabilize interior
components. Remove any packing material from inside the device enclosures.
Installation Steps
3.3 Receiving a Crated Analyzer
Installation Manual
Installation Manual, 12/2019, 2000595 Rev 1 15