EasyManua.ls Logo

Siemens LOGO! 24RC - C Determining the Cycle Time

Siemens LOGO! 24RC
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LOGO! Manual
A5E00067781 01
210
C Determining the Cycle Time
The program cycle is the complete execution of the pro-
gram, primarily the reading in of the inputs, the processing
of the program and the subsequent reading out of the out-
puts. The cycle time is the time required to execute a pro-
gram once in full.
The time required for a program cycle can be determined
using a short test program. The test program is created in
LOGO! and produces a value during processing in parame-
terization mode from which the current cycle time can be
calculated.
Test program
1. Create the test program by linking an output or marker
to a threshold switch and by switching a clock pulse
generator at its input, which is switched on by a hi sig-
nal.
Hi
Par
Qx
T
B02
B01
Output Q
or
Memory
marker M
2. Parameterize the two blocks as shown below. A clock
pulse is generated in each program cycle based on the
cycle time of 0 seconds. The time interval of the thresh-
old switch is set to 2 seconds.
B02:T
T =00.00s+
B01:Par
SW =1000+
SW =0000
G_T=02.00s

Table of Contents

Related product manuals