EasyManuals Logo

Siemens RL Instructions

Siemens RL
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
MAINTENANCE
P_a_g_e_12-------------------------------J11.,
J....
MAINTENANCE
CLOSING
NOTE
H
olding
the
spring
release
latch
down
pre-
vents
the
stored-energy
springs
from
prop-
ping
in
the
charged
position
.
Thus
,
when
the
handle
is
slowly
returned
to th
e
normal
vertical
position
,
the
energy
in
the
springs
is s
lowl
y
released
against
the
closing
handle
assembly
.
During
inspection
prior
to
installation,
and
for
routine
maintenance
inspections
,
the
circuit
breaker
contacts
may
be
closed
slowly
to
check
clearances
,
contact
adjust-
ments
, and
movement
of
links
and
latches
.
El
ectrica
lly
operated
breakers
do
not
have a
manual
charging
handle
,
but
it
is
available
as a
maintenance
item
.
When
the
hole
in
the
charging
handle
assembly
is
aligned
with
the
holes
in
the
operating
mechanism
frame,
the
pin
which
is
attached
to
the
cam
is
inserted
.
This
pin
holds
the
assembly
in
place
and
acts
as a
pivot
point
for
the
cam
.
After
insertion
of
the
maintenance
closing
handle
assem-
bly
on
the
electrically
operated
breaker
,
the
actual
main-
tenance
closing
operations
is
the
same
for
both
the
elec
-
trically
operated
and
the
manually
operated
circuit
breaker
.
Refer
to
Table
3,
Figure
5.
Figure
5.
Maintenance Closing
ADJUSTMENTS
Dur
in
g mai
ntenan
ce
inspe
ct i
on
s,
the
fol
l
ow
i
ng
items
should
be
checked
to
ensure
that
the
original
settings
are
maintained
:
Table 3. Maintenance Closing
Operation
Closing
Contacts
Opening
Contacts
Procedure
1. Verify
that
racking
mechanisms
is
in
TEST
position
.
2.
Pull
charging
handle
DOWN
ALL
THE
WAY
(approximately
120° ).
3. Place
blade
of
screwdr
iver between
hood
and
spring
release
latch
and
hold
it
in
DOWN
position.
4.
Slowly
return
handle
to
vertical
posi-
ti
on
. Observe
contact
,
touch
,
mechanical
operation,
etc
.
Push
in
manual
trip
rod
.
i
Qi\OTJ
/QN}
Th
e
procedure
in Table 3
should
be used
··
··········
for
maintenance
closing
o
nly
.
The
cir-
cuit
breaker
must
be
outside
of
the
cubi-
cle
during
any
maintenance
close
opera-
tion.
Mainta
in
a
firm
grip
on
the
manual
charg
i
ng
handle
during
the
cl
osing
stroke
-
the
c
ir
cu
it
breaker
may
sud-
denly
lat
ch
fully
closed
and
apply
unex-
pected
force
to
the
cha
rgin
g
handle
.
MAIN
CONTACT
MAKE
SEE
FIGURE
6.
Compression
of
the
contact
fingers
(46)
must
be between
.093" and .125" (2.4- 3.
2mm)
.
This
is
the
difference
in
the
1)
measurement
from
the
breaker
base
to
the
tip
of
the
finger
contact
surface
when
the
breaker
is
open
, 2)
the
measurement
in
the
same place when
the
breaker
is
closed
.
This
is
checked
with
a normal
closing
operation
-
not
maintenance
clos
i
ng
.
Adjustment
is
provided
by
posi-
tioning
screws
(78)
after
loo
sening
nuts
(80
).
Counter
-
clockw
i
se
rotation
of s
crew
s (78)
increa
ses
co
mpr
ession.
Care
should
be taken to reti
ghten
nuts
(80)
after
adjust
-
ment
.
If
it is
des
ired to
che
ck co
nta
ct
pr
essure, a push-
Courtesy of NationalSwitchgear.com

Other manuals for Siemens RL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens RL and is the answer not in the manual?

Siemens RL Specifications

General IconGeneral
Rated Voltage250VAC, 30VDC
Mechanical Life10, 000, 000 operations
Operating Temperature Range-40°C to +70°C
Contact ConfigurationSPDT
Contact Rating10A
Electrical Life100, 000 operations
Mounting TypePCB

Related product manuals