EasyManua.ls Logo

Siemens SIMATIC Compact FF Link - System Modification During Operation

Siemens SIMATIC Compact FF Link
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.3 System modification during operation
Adding a bus link with Compact FF Link
Perform the following steps in order to add a bus link and lower-level FF segment to an existing
system during operation.
1. Install the new bus link.
2. Connect the voltage supply of all modules,
3. Establish the PROFIBUS connection:
In non-redundant mode:
Connect the Compact FF Link to the DP master system that is connected to the CPU
of the the S7-400H.
In redundant mode:
Connect the left Compact FF Link to the S7-400H via the DP master system that is
connected to the left CPU or Rack 0.
Connect the right Compact FF Link to the S7-400H via the DP master system that is
connected to the right CPU or Rack 1.
Information regarding the complete procedure for a system modification and related
requirements can be found in the following documentation:
Modifying the system during operation via CiR (
http://support.automation.siemens.com/
WW/view/en/14044916)
Firmware update of the Compact FF Link (Page 50)
S7-400H Fault-Tolerant Systems (http://support.automation.siemens.com/WW/view/en/
1186523), section
System modification during operation,
step "Modification of hardware".
To use a Compact FF Link that has been previously used in another system, you must first
restore it to its factory settings.
Information regarding this can be found in section "Restoring a Compact FF Link FF to the
factory state (Page 51)".
Adding an FF device
Information on adding a new FF device to an existing system during operation can be found
in the following documentation:
Section "Connecting (Page 33)":
Operating Instructions DP/PA coupler, Active Field Distributor, DP/PA Link, and Y Link
(http://support.automation.siemens.com/WW/view/en/1142696).
Information on configuring can be found in the following documentation:
Process Control System PCS 7, FOUNDATION Fieldbus (http://www.siemens.com/pcs7-
documentation) Commissioning Manual.
Functions
10.3 System modification during operation
Compact FF Link
Operating Instructions, 03/2015, A5E35651552-AA 55

Table of Contents

Related product manuals