Configuration and operation   
4.5 Telecontrol communication (CP 1542SP-1 IRC) 
  CP 1542SP-1, CP 1542SP-1 IRC, CP 1543SP-1 
54  Operating Instructions, 01/2017, C79000-G8976-C426-03 
● 
 
Specifies the communications partner that establishes the connection (always the CP). 
● 
 
Port number of the communications partner 
"Connection to redundant partner" (only with DNP3 / IEC) 
● 
 
Enable the option if the communications partner is a redundant master. 
For information on the other parameters see above. 
● 
Partner monitoring time (only with DNP3 / IEC)
 
If the CP does not receive a sign of life from the communications partner within the 
configured time, the CP interprets this as a fault/error on the partner. If you enter 0, the 
function is deactivated. 
● 
Report partner status (connection to partner)
 
If the function is enabled, the CP signals the status of the connection to the 
communications partner to the CPU. 
–  Bit 0 of "PLC tag for partner status" (data type WORD) is set to 1 if the partner can be 
reached. 
–  Bit 1 is set to 1 if all the paths to the remote partner are OK (useful with redundant 
paths). 
–  Bits 2-3 indicate the status of the send buffer (frame memory). 
The following values are possible: 
- 0: Send buffer OK 
- 1: Send buffer threatening to overflow (more than 80 % full). 
- 3: Send buffer has overflowed (fill level 100 % reached). 
As soon as the fill level drops below 50%, bits 2 and 3 are reset to 0. 
Bits 4 to 15 of the PLC tags are not used and do not need to be evaluated in the program. 
● 
 
DNP3 conformity level supported by the partner. 
● 
 
Mode with which the frames in the send buffer of the CP (events) are transferred: 
–  Chronological transfer of individual frames 
or 
–  Block-by-block transfer of the frames of a data point