EasyManua.ls Logo

Siemens SINAMICS G120 PM240P-2 - Connecting Line and Motor Cables

Siemens SINAMICS G120 PM240P-2
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting
4.2 Connecting the line and motor cable at the converter
Power Module PM240P-2
Hardware Installation Manual, 06/2020, A5E37800827C AD
41
4.2 Connecting the line and motor cable at the converter
4.2.1 Connection overview
Figure 4-2 Block diagram PM240P-2
Figure 4-3 Connection overview
Connect cables at the converter so that they are EMC compliant
Attach the cable
tie holders to the Power
Module as shown to the left in the diagram
before you establish the connections.
Fix the line connecting cable using a cable
tie
as shown in
.
Fix the shield of the motor connecting cable
using a hose clamp (
).
Connect the shiel
d of the control cable with
the shield plate of the Control Unit (
) using
a steel band. Also attach the control cable to
the Power Module using a cable tie (
).

Table of Contents

Related product manuals