EasyManua.ls Logo

Siemens SINAMICS S110 - 3 Creating the Drive Project ONLINE; Requirements

Siemens SINAMICS S110
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Getting Started
Function Manual, 10/2008, 6SL3097-4AG10-0BP0
15
Creating the drive project ONLINE
3
3.1 Creating the drive project ONLINE
The following steps are required to create a drive object ONLINE:
Table 3- 1 Creating a project ONLINE
Step Activity
1 Ensure that the commissioning requirements are fulfilled.
2 Create a project with the help of a Wizard.
3 Carry out an ONLINE search for DRIVE-CLiQ stations.
4 Transfer the configuration to the PG/PC.
5 Operate the motor using the "control panel" in STARTER (motor rotating).
3.2 Requirements
The following prerequisites for creating a drive project ONLINE by means of the STARTER
commissioning tool must be fulfilled:
The components are assembled (see chapter 2).
The drive unit has been switched on in accordance with regulations.
Control Unit CU305 is connected to a PG/PC.
The STARTER commissioning tool has been called up on the PG/PC.

Other manuals for Siemens SINAMICS S110

Related product manuals