EasyManua.ls Logo

Siemens SXG 75 - Detailed SXG75 Battery Charging Control

Siemens SXG 75
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Release 1.1
Technical Documentation
11/2005
TD_Repair_L1-L3_SXG75_R1.1.pdf Page 45 of 61
External Antenna
7 Call from MS • GSM900
• high TCH
• second highest PCL
• BS Power = -75 dBm
• middle BCCH
• Keyboard check • individual
check
8 TX GSM Band 1 • high TCH
• second highest PCL
• BS Power = -75 dBm
• middle BCCH
• Frequency Error
• Phase Error RMS
• Phase Error Peak
• Average Power
• Power Time Template
• GSM Spec.
9 RX GSM Band 1 • high TCH
• BS Power = -102 dBm
• 50 Frames
• middle BCCH
• RX Level
• RX Qual
• BER Class Ib
• BER Class II
• BER Erased Frames
• GSM Spec.
10 Handover to GSM Band 2
Including Handover
Check
11 TX GSM Band 2 • high TCH
• second highest PCL
• BS Power = -75 dBm
• middle BCCH
• Frequency Error
• Phase Error RMS
• Phase Error Peak
• Average Power
• Power Time Template
• GSM Spec.
12 RX GSM Band2 • high TCH
• BS Power = -102 dBm
• 50 Frames
• middle BCCH
• RX Level
• RX Qual
• BER Class Ib
• BER Class II
• BER Erased Frames
• GSM Spec.
13 Call relaese from MS
Final Inspection:
The final inspection contains:
1) A 100% network test (location update, and set up call).
2) Refer to point 3.3.
3) A random sample checks of:
- Data reset (if required)
- Optical appearance
- complete function
4) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.
Company Confidential
2005©BenQ

Other manuals for Siemens SXG 75

Related product manuals