EasyManua.ls Logo

Simco ECM 30 Series - Functional Check

Simco ECM 30 Series
98 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9752090250 ECM Lite 11/03
28
7. Functional check
The [OVERLOAD] LED will light up:
- in case of spark-over
- when the generator is overloaded (maximum current is reached). With an overload, the
output voltage is decreased until the maximum current is supplied.
8. Options
8.1. Summary
Switching on/off (remote on/off) and setting the output voltage are functions that can be
remotely controlled. A 25-pin Sub-D-connector has been fitted at the rear of the unit for this
purpose.
The options can be installed using low voltage / datacable.
Pin Function Pin Function
1 Remote on/off +12V 14 Remote on/off 0V
2 n.c. 15 n.c.
3 External set point 16 GND
4 n.c. 17 GND
5 n.c. 18 Extern set point enable
6 n.c. 19 n.c.
7 +12V internal 20 0V internal
8 n.c. 21 n.c.
9 n.c. 22 n.c.
10 n.c. 23 n.c.
11 n.c. 24 GND
12 n.c. 25 Remote on/off enable
13 n.c.
n.c. not connected
Sub-D connector layout (rear panel view).
Warning:
- When carrying out work on the equipment: de-energise the equipment.
- Work on the equipment must be carried out by a skilled electrical engineer.
- Only connect the specified voltages to the control circuits.
- Use only shielded cables and shielded Sub-D connectors for the connections.