49
Installation and Maintenance
Step
Procedure
3.Remove foam(inner side)
Remove screws xing the foam(inner side) and then
remove the foam(inner side).
4.Remove foam(outside)
Remove screws xing the foam(outside) and then
remove the foam(outside).
5.Remove Electric Box Cover
Remove screws xing the electric box cover and then
remove the electric box cover.
screws
screws
screws
Electric box cover