EasyManua.ls Logo

SINNOWA BS3000S - Corrections and Replacements to Common Parts of Analyzer; The Replacements of Fuse; The Replacement to Light Source

Default Icon
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BS Series Multitest Analyzer
10
Maintenance: Plasma (serum) and reagent incubate more than 3 minutes in winter it should
around 5 minutes. Or reference to the manual, run the calibration procedure to calibration.
6.2 The corrections and replacements to common parts of
analyzer
In order to make the analyzer’s running reliable, it’s necessary to proofread or replace some
parts of analyzer and take effective maintenance.
Attention:
The user must be trained by our professional engineers before they take maintenance and
replacements alone.
6.2.1 The replacements of fuse
The concrete steps of replacement are as follows:
1. Turn off the power of analyzer and pull out the power cord.
2. Pull the power wire from the power socket of mainframe and elicit the fuse housing.
3. Take out the fuse housing and install a new fuse into fuse housing.
4. Plug the fuse housing into original position
Warning:
The operator must use fuse of appointed specification.
6.2.2 The replacement to light source
The standard configuration of the instrument has a halogen lamp set in the opposite position of
detector; Two LED light sources are disposed on two adjacent sides of the detection position
and the detector.
It needs replacing while the lamp is damaged or has been working for 2 years.
The steps as follows:
1. 15 minutes after analyzer’s turnoff
2. Open the analyzer
3. Unload cuvettes pallet
4. Unplug the Plugin of the lamp connected to power
5. Unscrew the screws, remove the lamp
6. New lamp fitted in accordance with the above order

Related product manuals