EasyManua.ls Logo

SMA STP 50-40 - Scope of Delivery

SMA STP 50-40
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Scope of Delivery
SMA Solar Technology AG
Operating manualSTP50-4x-BE-en-2316
3 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your
distributor if the scope of delivery is incomplete or damaged.
B C E
F
J
I
A
+
_
G
L
D
H
K
Figure 1: Components included in scope of delivery
Position Quantity Designation
A 1 Inverter
B 4 Foot
C 8 Hexagon bolt M8x40
D 8 Washer
E 4 Carrying handle
F 12 Positive DC connector
G 12 Negative DC connector
H 24 Sealing plug for DC connectors
I 1 Cable gland M63 with counter nut
J 1 Alternative seal insert with reduced clamping range (26mm to
39mm) for M63 cable glands
K 1 3-pole terminal block
L 1 Quick reference guide with password label on the rear side
The label contains the following information:
PIC (Product Identification Code) identification key for
registering the system in SunnyPortal
RID (Registration Identifier) registration ID for registering the
system in SunnyPortal
WLAN password WPA2-PSK (WiFi Protected Access 2 -
Preshared Key) for direct connection to the inverter via WLAN

Table of Contents

Related product manuals