6 Electrical Connection
SMA Solar Technology AG
Operating manualSTP50-4x-BE-en-2338
In PV systems with multiple inverters, protect each inverter with a separate three-phase circuit
breaker. Make sure to observe the maximum permissible fuse protection (see Section13,
page120). This will prevent residual voltage from being present at the corresponding cable
after disconnection.
Loads installed between the inverter and the circuit breaker must be fused separately.
Residual-current monitoring unit:
The inverter does not require an external residual-current device when operating. If local
regulations require the use of a residual-current device, the following must be observed:
The inverter is compatible with type B residual-current devices that have a rated residual
current of 300mA or higher (information about the selection of a residual-current device see
technical information "Criteria for Selecting a Residual-Current Device" at www.SMA-
Solar.com). Each inverter in the system must be connected to the utility grid via a separate
residual-current device.
When using residual-current devices with a rated residual current < 500mA, the rated residual
current must be set in the inverter (see Section8.23, page83). In this way the inverter
reduces the operational leakage currents and prevents a false triggering of the residual-current
device.
Overvoltage category:
The product can be used in grids of overvoltage categoryIII or lower in accordance with
IEC60664-1. That means that the product can be permanently connected to the grid-connection
point of a building. In case of installations with long outdoor cabling routes, additional measures to
reduce overvoltage categoryIV to overvoltage categoryIII are required (see the Technical
Information "Overvoltage Protection" at www.SMA-Solar.com).
6.2.2 Connecting the Inverter to the Utility Grid
Requirements:
The connection requirements of the grid operator must be met.
The grid voltage must be within the permissible range. The exact operating range of the
inverter is specified in the operating parameters.
Procedure:
1. Disconnect the miniature circuit breaker from all 3 line conductors and secure against
reconnection.
2. Ensure that the DC load-break switch is in the O position and is secured against reconnection.

Table of Contents