SMA Solar Technology AG 3 Initial Setup and Start
Installation Guide SHP75-10-STP60-10-IA-xx-18 33
3.2.4 Grid Code File
3.2.5 Configuring the Fallback
If the communication between the inverter and the SMA
Inverter Manager is interrupted, the inverter switches to a
previously defined operating state (Fallback). The desired
operating state when communication is interrupted, can be
activated and configured with the customer-specific grid
code file or via the LCS-Tool. For further information on the
configuration of the system fallback between the SMA
Inverter Manager and a superior control unit (e.g. SCADA
system or Power Plant Controller) see installation manual of
the SMA Inverter Manager / SMA Digital I/O Box /
LCS-Tool.
Table 3.3 Configurable parameters after communication interruption
INFORMATION
If the desired grid code is not available, or if the
LCS-Tool displays a warning about incompatible
software versions, the grid code and software library
must be updated on the LCS-Tool.
It is possible to create customer-specific grid code
files with adjusted set values. For this purpose, please
contact SMA Technology AG.
INFORMATION
Observe the specifications of your electric utility
company.
Parameter Configurable
value range
Switch-on time after interrupted
communication
2 to 20 sec.
Length of fallback 0 to 100 days
Reaction P 0 to 100%
Reaction Q
(Q has a higher priority than P)
0 to 100%