EasyManua.ls Logo

SMA STP 60-10 - Maintenance

SMA STP 60-10
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Service SMA Solar Technology AG
40 SHP75-10-STP60-10-IA-xx-18 Installation Guide
Table 4.5 Events caused by the self-test
4.2 Maintenance
Ensure that the heat sink at the rear of the inverter is not
covered.
Clean the contacts of the PV load-break switch once a year.
Clean by cycling the switch to on and off positions ten times.
The PV load-break switch is located at the bottom of the
inverter.
For correct operation and a long service life, ensure free air
circulation for the following areas:
around the heat sink at the top and side of the inverter
where the air exhausts, and
towards the fan on the underside of the inverter.
To clear obstructions, clean using compressed air, a soft
cloth, or a brush.
350–
352
Residual-current monitoring unit (RCMU)
self-test failed.
Contact the service. - x -
353 Current sensor test failed. Contact the service. - x -
356–
361
Transistor and relay test failed or inverter
relay has failed (contact assumed
welded).
Warning: Do not operate the DC
load-break switch of the inverter.
Switching off the DC voltage using a
suitable DC load-break switch in the
Combiner Box is still possible. Do not
perform any further actions or switching
operations on the inverter. Contact
Service immediately.
-x-
366 Residual-current monitoring unit (RCMU)
self-test failed.
Contact the service. - x -
ID Description Measures DNO SMA
Service
Line
PV
The temperature of the heat sink can exceed 70°C.

Table of Contents

Other manuals for SMA STP 60-10

Related product manuals