8 Operation
SMA Solar Technology AG
Operating manualSBxx-1AV-41-BE-en-1250
8 Operation
8.1 Establishing a connection to the user interface
8.1.1 Establishing a Direct Connection via Ethernet
Requirements:
The product must be commissioned.
An end device (e.g. computer) with an Ethernet interface must be available.
The product must be connected directly to the end device.
The respective latest version of one of the following web browsers must be installed: Chrome,
Edge, Firefox, Internet Explorer or Safari.
The SMA Grid Guard code of the Installer must be available for the changing of grid-relevant
settings after completion of the first ten feed-in hours or installation assistant (see "Application
for SMAGridGuard Code" at www.SMA-Solar.com).
IP address of the inverter
Standard inverter IP address for the direct connection via Ethernet: 169.254.12.3
Procedure:
1. Open the web browser of your end device, enter the IP address 169.254.12.3 in the address
bar and press the enter key.
2.
Web browser signals a security vulnerability
After the IP address has been entered, a message might appear indicating that the
connection to the user interface of the product is not secure. SMA Solar Technology AG
guarantees the security of the user interface.
Continue loading the user interface.
The login page of the user interface opens.
8.1.2 Establishing a direct connection via WLAN
Requirements:
The product must be commissioned.
An end device (e.g. computer, tablet PC or smartphone) must be available.
The respective latest version of one of the following web browsers must be installed: Chrome,
Edge, Firefox, Internet Explorer or Safari.
JavaScript must be enabled in the web browser of the end device.
The SMA Grid Guard code of the Installer must be available for the changing of grid-relevant
settings after completion of the first ten feed-in hours or installation assistant (see "Application
for SMAGridGuard Code" at www.SMA-Solar.com).