40 SB3-5TL-21-BE-en-10 Operating Manual
8 Configuration SMA Solar Technology AG
8Configuration
8.1 Procedure
Once you have commissioned the inverter, you may have to adjust various settings via the rotary
switches in the inverter or via a communication product. This section describes the procedure for
configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure See
1. If the display language is not set correctly, adjust the
settings.
Section 8.2, page 41
2. If the inverter is equipped with a Speedwire/
Webconnect data module, integrate the inverter in a
Speedwire network and register it in Sunny Portal, if
necessary.
Communication interface manual
at www.SMA-Solar.com
3. Capture the inverter in a communication product in
order to manage the PV system data or to set the inverter
parameters.
Manual of the communication
product at www.SMA-Solar.com
4. Change the PV system time and PV system password. Manual of the communication
product at www.SMA-Solar.com
5. If the inverter was installed in a network such as an
IT network, deactivate the grounding conductor
monitoring.
Section 8.4, page 42
6. Activate and set SMA OptiTrac Global Peak for partially
shaded PV modules.
Section 8.5, page 43