3 Initial Setup and Start SMA Solar Technology AG
22 STP60-JP-10-IA-en-11 Installation Manual
The screen design is divided into different sections:
1. Main screen. Current and daily yield.
This section contains:
Actual output power (kW)
Yield of the current day (kWh)
Total yield (kWh)
Current date
Current time
Operating mode (#)
2. Inverter information. This section contains:
Inverter device type
Inverter name
Inverter serial number
IP address
Serial number of the SMA Inverter Manager
Software version of the inverter
3. Actual values This section contains:
PV voltage and current
Phase-to-phase voltages
Phase currents
Grid frequency
3.2.1 Initial Setup via LCS-Tool
The inverter and the SMA inverter manager must be
commissioned via the local commissioning and service tool
(LCS-Tool). Commissioning is necessary before the inverter
is connected to the AC utility utility grid and feed-in
operation begins.
The LCS too enables the selection of predefined country
data sets for different utility grids. Customer-specific country
data sets can be provided by SMA and imported via the
LCS tool (see installation manual of the SMA Inverter
Manager / SMA Digital I/O Box / LCS Tool).
After installation, check all cables and close the inverter.
Turn on AC power.
3.2.2 Switching on the PV
Load-Break Switch
Figure 3.2. PV load-break switch
Switch on the PV load-break switch at the inverter and,
if available, at the PV array junction box.
3.2.3 Commissioning
The inverter starts automatically if sufficient solar irradiation
is available. Commissioning takes a few minutes. During this
period, the inverter performs a self-test.
3.2.4 Grid Code File
Selecting the correct grid code is important in order to
comply with the local and national standards.
It is possible to create customer-specific grid code files
with adjusted set values (see Section 3.2.4).
INFORMATION
The inverter is protected against short-term reverse
polarity. The inverter does not generate feed-in
power until any reverse polarity is corrected.
Prolonged reverse polarity leads to a failure of the inverter
and thus will void the warranty.
Make sure that the cables are correctly connected to
the inverter.
INFORMATION
If the desired grid code is not available, or if the LCS
tool displays a warning about incompatible software
versions, the grid code and software library must be
updated on the LCS tool.
It is possible to create customer-specific grid code
files with adjusted set values. For this purpose, please
contact SMA Technology AG.