EasyManua.ls Logo

SMA SUNNY TRIPOWER 60 - Maintenance

SMA SUNNY TRIPOWER 60
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA Solar Technology AG 4 Service
Installation Manual STP60-JP-10-IA-en-11 29
Events Caused by the Self-Test
Table 4.5 Events caused by the self-test
4.2 Maintenance
Ensure that the heat sink at the rear of the inverter is not
covered.
Clean the contacts of the PV load-break switch once a year.
Clean by cycling the switch to on and off positions ten times.
The PV load-break switch is located at the bottom of the
inverter.
For correct operation and a long service life, ensure free air
circulation for the following areas:
around the heat sink at the top and side of the inverter
where the air exhausts, and
toward the fan at the inverter base.
To clear obstructions, clean using compressed air, a soft
cloth, or a brush.
ID Description Measure DNO SMA
Service
Line
PV
100 PV input current is negative. Sensor fault. Check the polarity of the PV system. If
polarity is correct, call Service.
-x-
264,
266
Measurement circuit test failed. Restart the inverter. If the event persists,
call Service.
-x-
272 PV overvoltage protection device error.
Inverter will continue operation without
overvoltage protection.
Replace PV overvoltage protection
device. See SPD replacement
instructions for details.
-x-
273 Grid overvoltage protection device
error. Inverter will continue operation
without overvoltage protection.
Replace PV overvoltage protection
device. See SPD replacement
instructions for details.
-x-
274 Overvoltage protection device status
unknown.
Restart the inverter. If the event persists,
call Service.
-x-
350–
352
Residual-current monitoring unit (RCMU)
self-test failed.
Contact the Service. - x -
353 Current sensor test failed. Contact the Service. - x -
356–
361
Transistor and relay test failed or inverter
relay has failed (contact assumed
welded).
Contact the Service. - x -
366 Residual-current monitoring unit (RCMU)
self-test failed.
Contact the Service. - x -
The temperature of the heat sink can exceed 70°C.

Other manuals for SMA SUNNY TRIPOWER 60

Related product manuals