EasyManua.ls Logo

SMA SWR 2500U - V1.2 - 2.3 Electric Connection Procedures

SMA SWR 2500U - V1.2
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sunny Boy 2500U Installation and Operator’s Manual
SB2500U-11:NE - 11 - SMA Regelsysteme GmbH
Preparing the Mounting
The Sunny Boy is mounted on its back side with the 3 metal straps. For that 3 screws
and 3 according dowels (wall anchors) are necessary. The screws and dowels are
not included. We recommend 6 mm screws and 8 mm dowels.
NOTE: For outside mounting use stainless steel screws. Use a plastic
washer in order to avoid scratching the paint.
Fig. 2.3: Side view of the mounting to wall
Metal straps for mounting: The top straps take the load, the bottom is screwed
down in order to prevent the tilting off the wall.
Mounting to wall
Mark the holes with the drilling template.
Drill the holes (and put in the wall anchors), put in the screws of both top holes
and screw them in until ca. 4 mm are sticking out.
Hang the inverter into the two top screws.
Fasten the bottom screw. This will prevent lifting of the inverter case.
Check the mounting of the inverter.

Related product manuals