EasyManuals Logo

SMC Networks INR-244-749 User Manual

SMC Networks INR-244-749
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
HEC-OM-O018-A
Chapter 4 System Set-up
4.4 Turning ON power
4-5
4.4 Turning ON power
1. Make sure that Main power switch is OFF. Turn ON the power breaker
on primary side (your tool side).
2. Turn ON Main power switch.
3. Controller will indicate the current Bath liquid temperature after approx.
6 sec.
z If an alarm occurs after the power is turned on, check the indicated
content of the alarm and turn off the power to find the cause so that
appropriate measures can be taken.
4.5 Setting of Values
When the product has been found to start operating normally set the values
such as temperature.
4. Perform offset adjustment if necessary, referring to page 5-4, Details of
Operation Mode”.
5. Set each value such as bath liquid temperature and upper and lower
temperature limit.
z Set required values, referring to page
5-4, Details of Operation Mode”.
With this action, all preparation is complete. When the product is returned
to the operation mode, it will operate with these set conditions.
6. Once values are set, they will not be erased even when main power
switch is turned off.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks INR-244-749 and is the answer not in the manual?

SMC Networks INR-244-749 Specifications

General IconGeneral
BrandSMC Networks
ModelINR-244-749
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals