Page | 10
If all the wiring is OK you should hear the pump run. If it does, click Reset to stop it.
If you have a relay or solenoid or light (LED) connected to General Purpose Outputs 1 or 2 (GPO1 and GPO2)
you can also test them this way, but ensure you are using 100% duty ONLY. With solenoids or relays you
may need a helper to listen for the CLICK as you toggle Set and Reset.
Step 10 Unit Calibration
Ensure Ignition is OFF
Unless already done, connect the controller and the laptop using the supplied USB cable (See Step 3)