Page | 1
Snow Performance Boost Cooler® Gas Water-Methanol Injection Kit Instructions
(Part#’s 210, 210-BRD)
CAUTION: You must completely read through these instructions before installing and operating
this product. Failure to do so can result in damage to this product and the vehicle.
Version: 1.0
Congratulations on your purchase of a Snow Performance Boost Cooler® Gas Water-Methanol
Injection kit! Keep these instructions for reference. First locate the part# of your injection system
which can be found on the front of the Boost Cooler® box. Use this number to identify which set of
electrical and setting instructions to follow.
Required Tools Needed For Install:
● Phillips/Flat Head Screwdriver
● Power Drill
● Razor Blade
● Preferred Electrical Connectors (Crimping/Stripping Tools, Blue Butts, Eye Hooks, Posi-Taps,
Fuse Taps, Soldering Supplies etc)
● Spare 16 Gauge Wire (Optional Depending On Install)
● Open End Wrench / Socket Set
● 1/8” – 27 NPT Tap (Optional Depending On Install)
Average Install Time: 4-6 Hours
Locate the wiring diagram for your injection kit further in these instructions beginning
on page 8 for overview of system layout before attempting install.