Congratulations on your purchase of a Snow Performance Boost Cooler® Gas Water-Methanol
Injection kit! Keep these instructions for reference. First locate the part# of your injection system
which can be found on the front of the Boost Cooler® box. Use this number to identify which set of
electrical and setting instructions to follow.
Required Tools Needed For Install:
●
Phillips/Flat Head Screwdriver
●
Power Drill
●
Razor Blade
●
Preferred Electrical Connectors (Crimping/Stripping Tools, Blue Butts, Eye Hooks, Posi-Taps,
Fuse Taps, Soldering Supplies etc)
●
Spare 16 Gauge Wire (Optional Depending On Install)
●
Open End Wrench / Socket Set
●
1/8” – 27 NPT Tap (Optional Depending On Install)
Average Install Time: 4-6 Hours
www.snowperformance.net
© 2017 Snow Performance, Inc.
Locate the wiring diagram for your injection kit further in these instructions beginning on
page 8 for overview of system layout before attempting install.
CAUTION: You must completely read through these instructions before installing and operating this
product. Failure to do so can result in damage to this product and the vehicle.