SOFAR 3K~6KTLM-G2 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 38 -
5. Commissioning of inverter
5.1. Safety inspection before commissioning
Ensure that DC and AC voltages are within the acceptable range
of the inverter.
Attention
5.2. Start inverter
Step 1: Turn ON the DC switch. (optional)
Step 2: Turn ON the AC circuit breaker.
When the DC power generated by the solar array is adequate, the SOFAR
3K~6KTLM-G2 inverter will start automatically. Screen showing normal
indicates correct operation.
NOTE: Choose the correct country code. (refer to section 6.3 of this manual)
Notice: Different distribution network operators in different countries have different
requirements regarding grid connections of PV grid connected inverters.
Therefore, it's very important to make sure that you have selected the correct
country code according to requirements of local authority. Please consult qualified
electrical engineer or personnel from electrical safety authorities about this.
Shenzhen SOFARSOLAR Co., Ltd. is not responsible for any consequences
arising out of incorrect country code selection.
If the inverter indicates any fault, please refer to Section 7.1 of this manual
trouble shooting for help.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sofar 5000TLM-G2 and is the answer not in the manual?

Sofar 5000TLM-G2 Specifications

General IconGeneral
BrandSofar
Model5000TLM-G2
CategoryInverter
LanguageEnglish

Related product manuals