5
Grid Tied PV System with Battery Backup – User Manual
Version UM1142-PV-BT-v1.0 © solarcity 2019
Monitoring
Unit (EMU)
4. START-UP AND SHUTDOWN PROCEDURES
Under normal circumstances, the system should not need any intervention. The system may need to be shut down in an emergency, or
if your electrician needs to work on the wiring in your home. Follow these procedures if the system needs to be shut down or started.
4.1 System shutdown procedure
1. In the AC switchbox:
a. Turn off the EMU supply switch, the grid supply switch and the backup supply switch