Contents
Disclaimers 1
Important Notice 1
Emission Compliance 2
Contents 3
Support and Contact Information 5
Version History 6
HANDLING AND SAFETY INSTRUCTIONS 7
Safety Symbols Information 7
IMPORTANTINVERTERSAFETYINSTRUCTIONS 8
Chapter 1: Introducing the SolarEdge Power Harvesting System 10
Power Optimiser 10
Three Phase Inverter with Synergy Technology 11
Monitoring Platform 12
Installation Procedure 12
Installation Equipment List 12
Chapter 2: Installing the Power Optimizers 14
Safety 14
Installation Guidelines 15
Step 1: Mounting the Power Optimizers 17
Step 2: Connecting a PV Module to a Power Optimiser 17
Step 3: Connecting Power Optimisers in Strings 18
Step 4: Verifying Proper Power Optimiser Connection 19
Chapter 3: Installing the Primary and Secondary Unit(s) 21
Primary Unit Package Contents 21
Secondary Unit Package Contents 21
Identifying the Units 21
Primary Unit Interface 22
Connection Unit Interface 26
Secondary Unit Interface 28
Mounting and Connecting the Primary and Secondary Unit(s) 28
Chapter 4: Connecting the AC and Strings to the Connection Unit 36
Grid Connection Guidelines 36
Connecting the AC Grid to the Connection Unit 37
Connecting the AC Grid and Grounding to the Connection Unit 38
Connecting the Strings to the Connection Unit 40
Selecting a Residual Current Device (RCD) 42
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 43
Contents 3
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2