Step 3: Verifying Proper Activation and Commissioning 47
Viewing System Status 48
Reporting and Monitoring Installation Data 55
Chapter 5: Setting Up Communication to the Monitoring Platform 58
Communication Options 58
Communication Connectors 60
Removing the Inverter Cover 61
Removing the Connection Unit with Safety Switch Cover 61
Creating an Ethernet (LAN) Connection 63
Creating an RS485 Bus Connection 66
Verifying the Connection 68
Chapter 5: Errors and Troubleshooting 70
Identifying Errors 70
EV Charger-related Troubleshooting 71
Power Optimizer Troubleshooting 74
Mechanical Specifications 76
Appendix A: Replacing and Adding System Components 77
Fuse Replacement 77
Replacing an Inverter 78
Replacing the Connection Unit with Safety Switch 80
Appendix B: Connecting an External Meter to an Inverter 83
Connecting an External Meter to an Inverter 83
Connecting an External Meter to an Inverter with a Built in Revenue Grade Meter
(RGM) 83
Technical Specifications - EV Charging Single Phase Inverter (North America) 84
Inverter Specifications 84
Default Trip Limits and Times According to IEEE1547 86
Recommended OCPD Size per Grid 87
EV Charger and EV Charger Cable Specifications 87
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1
6 Support and Contact Information