Installation Guide
Three Phase Inverter with
Synergy Technology
For Europe and APAC
Version 1.2

Table of Contents

Questions and Answers:

SolarEdge SE55K Specifications

General IconGeneral
BrandSolarEdge
ModelSE55K
CategoryInverter
LanguageEnglish

Summary

Handling and Safety Instructions

Safety Symbols Information

Explanation of safety symbols used in the document for hazard identification.

Important Inverter Safety Instructions

Monitoring Platform

Installation Procedure

Step-by-step guide for installing and setting up a new SolarEdge site.

Installation Equipment List

Recommended tools and equipment needed for system installation.

Chapter 2: Installing the Power Optimizers

Safety

Important safety notes and warnings applicable during power optimizer installation.

Installation Guidelines

Guidelines for mounting and connecting power optimizers to PV modules and strings.

Step 1: Mounting the Power Optimizers

Step 2: Connecting a PV Module to a Power Optimiser

Procedure for connecting a PV module to a power optimizer.

Step 3: Connecting Power Optimisers in Strings

Step 4: Verifying Proper Power Optimiser Connection

Chapter 3: Installing the Primary and Secondary Unit(s)

Secondary Unit Interface

Mounting and Connecting the Primary and Secondary Unit(s)

Instructions for mounting and connecting the primary and secondary units.

Chapter 4: Connecting the AC and Strings to the Connection Unit

Grid Connection Guidelines

Guidelines and requirements for connecting the inverter to the AC grid.

Connecting the AC Grid to the Connection Unit

Connecting the AC Grid and Grounding to the Connection Unit

Connecting the Strings to the Connection Unit

Selecting a Residual Current Device (RCD)

Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp

Step 2: Commissioning and Configuring the Installation

Pairing

Communication

Power Control

Maintenance

Step 3: Verifying Proper Activation and Commissioning

Chapter 6: Setting Up Communication

Ethernet

RS485

GSM

Communication Connectors

Creating an Ethernet (LAN) Connection

Creating an RS485 Bus Connection

RS485 Bus Configuration

Appendix A: Errors and Troubleshooting

Power Optimizer Troubleshooting

Troubleshooting Communication

Appendix C: SafeDC

Appendix E: Replacing System Components

Replacing a Secondary Unit

Replacing Power Optimisers

Appendix F: Determining the Circuit Breaker Size

Determining the Size of an Inverter Circuit Breaker

Related product manuals