1.
Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform
The communication option used to communicate between multiple
SolarEdge devices or other external non-SolarEdge devices, such as
electricity meters or loggers.
2.
Tap the Server red arrow to set the communication method to be used for
communication between devices and the SolarEdge monitoring platform. The
default is LAN.
NOTE
The Server menu shows only the communication options installed in the
inverter.
For detailed information about all the configuration options, refer to the
Communication Options Application Note
, available on the SolarEdge
website at https://www.solaredge.com/sites/default/files/solaredge-
communication_options_application_note_v2_250_and_above.pdf.
Power Control
Power control options are detailed in the
Power Control Application
Note
, available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/application_note_power_control_
configuration.pdf.
The Grid Control option may be disabled. Enabling it opens additional options in the
menu.
The Energy Manager option is used for setting power export limitation,
as described in the
Export Limitation Application Note
, available on the
SolarEdge website at https://www.solaredge.com/sites/default/files/feed-in_
limitation_application_note.pdf.
Device Manager
From the Commissioning menu, select Device Manager to configure various system
Smart Energy Management devices.
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
46 Step 2: Commissioning and Configuring the Installation