Installation Guide
EV Charging Single Phase
Inverter
with SetApp Configuration
For Australia
Version 1.2

Table of Contents

Questions and Answers:

SolarEdge SE5000H-AU Specifications

General IconGeneral
Rated Output Power5000 W
Rated AC Power5000 W
Maximum Efficiency98.2%
MPPT Efficiency99.9%
CEC Weighted Efficiency97.5%
Number of MPPTs1
AC Frequency50 / 60 Hz
Ingress ProtectionIP65
Operating Temperature Range-25 to +60 °C
AC Voltage230 V
Communication InterfacesRS485, Ethernet
Safety StandardsAS/NZS 4777.2, IEC 62109
Warranty12 years
CoolingNatural Convection

Summary

Handling and Safety Instructions

Important Safety Instructions

Crucial safety guidelines to be followed during installation and operation.

Chapter 2: Installing the Power Optimisers

Safety

Safety notes and warnings specific to the installation of power optimisers.

Step 1: Mounting the Power Optimisers

Detailed instructions for physically mounting the power optimisers.

Step 2: Connecting Power Optimisers in Strings

Procedures for connecting power optimisers into series strings.

Step 3: Verifying Proper Power Optimiser Connection

Steps to check if power optimisers are correctly connected and functioning.

Chapter 3: Installing the Inverter

Mounting the Inverter

Instructions for securely mounting the inverter to a support structure.

Chapter 4: Connecting the AC and the Strings to the Connection Unit

Connecting the Strings to the Connection Unit with Safety Switch

Procedures for connecting DC strings to the connection unit.

Chapter 5: Activating, Commissioning and Configuring the System

Step 1: Activating the Installation

Process for activating the inverter and upgrading its firmware.

Step 2: Commissioning and Configuring the Installation

Guidance on configuring system settings like country, language, and pairing.

Step 3: Verifying Proper Activation and Commissioning

Checks to confirm the system is correctly activated and commissioned.

Chapter 6: Setting Up Communication to the Monitoring Platform

Creating an Ethernet (LAN) Connection

Step-by-step guide for connecting the inverter via Ethernet.

Creating an RS485 Bus Connection

How to set up an RS485 bus for multiple inverters.

Verifying the Connection

Steps to confirm successful establishment of communication.

Chapter 7: Errors and Troubleshooting

Identifying Errors

Methods for identifying error codes using inverter LEDs or the monitoring platform.

EV Charger-related Troubleshooting

Specific troubleshooting steps for errors related to the EV charger function.

Troubleshooting Communication

Guidance for resolving issues with LAN and RS485 communication.

Power Optimiser Troubleshooting

Solutions for common problems encountered with power optimisers.

Appendix A: Replacing and Adding System Components

Appendix C: SafeDC™

Technical Specifications - EV Charging Single Phase Inverter - (Australia)