Installation Guide
Three Phase Inverter with
Synergy Technology
For Europe and APAC
Version 1.2

Table of Contents

Questions and Answers:

SolarEdge SE82.8K Specifications

General IconGeneral
BrandSolarEdge
ModelSE82.8K
CategoryInverter
LanguageEnglish

Summary

Handling and Safety Instructions

Important Inverter Safety Instructions

Installation Procedure

Chapter 2: Installing the Power Optimizers

Safety

Critical safety notes and warnings applicable to installing SolarEdge power optimizers.

Installation Guidelines

Instructions for mounting power optimizers, including frame-mounted and module considerations.

Step 1: Mounting the Power Optimizers

Procedure for determining mounting location and securing power optimizers to the support structure.

Step 2: Connecting a PV Module to a Power Optimiser

Guidance on connecting PV modules to power optimizer input and output connectors.

Step 3: Connecting Power Optimisers in Strings

Instructions for connecting power optimizers in series to form strings, detailing cable usage and length.

Step 4: Verifying Proper Power Optimiser Connection

Method for verifying correct power optimizer connection by measuring string voltage and polarity.

Chapter 3: Installing the Primary and Secondary Unit(s)

Mounting and Connecting the Primary and Secondary Unit(s)

Step-by-step guide for mounting and connecting the Primary and Secondary inverter units to the installation structure.

Chapter 4: Connecting the AC and Strings to the Connection Unit

Grid Connection Guidelines

Guidelines for connecting the inverter to the AC grid, including country-specific requirements and supported grid types.

Connecting the AC Grid to the Connection Unit

Procedure for connecting the AC power grid to the inverter's Connection Unit, including safety precautions.

Connecting the AC Grid and Grounding to the Connection Unit

Detailed steps for connecting AC grid power and grounding wires to the Connection Unit.

Connecting the Strings to the Connection Unit

Guide for connecting DC strings from PV modules to the Connection Unit's DC input terminals.

Selecting a Residual Current Device (RCD)

Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp

Step 1: Activating the Installation

Procedure for activating the inverter, establishing Wi-Fi connection, and upgrading system firmware.

Step 2: Commissioning and Configuring the Installation

Guide to using the SetApp for configuring inverter settings like country, language, and pairing.

Chapter 6: Setting Up Communication

Appendix A: Errors and Troubleshooting

Appendix C: SafeDC

Appendix E: Replacing System Components

Appendix F: Determining the Circuit Breaker Size