Connect the red wire to any of the DC+ terminals in the inverter.
Connect the black wire to any of the DC- terminals in the inverter.
Figure 45: DC terminals
3.
Connect the AC wires according to the labels on the ACterminal blocks, as follows:
Wire type Connect to terminal
Figure 46: AC terminals
Line 1 L1
Line 2 L2
Line 3 L3
PE (grounding)
Neutral N
4. Tighten the screws of each terminal with a torque of 0.88-1.1 lb.*ft / 1.2-1.5 N*m.
5. Verify that there are no unconnected wires at the output of the Safety Switch and
that any unused terminal screws are tightened.
6. Connect the DC and AC wires to the Safety Switch. Refer to
Connecting the AC and
the Strings to the Safety Switch
on page 41.
7. Ensure proper conduit sealing; inspect the entire conduit run and use standard
conduit sealants to avoid water penetration.