4 Support Contact Information
MAN-01-00654-1.0 StorEdge Three Phase Inverter Wiring and On Site Check Quick Guide
11.
Run a battery self-test (supported from firmware version 4.8):
Make sure the battery's circuit breaker switch is ON.
Switch the inverter ON/OFF/P switch to ON.
In SetApp, select Commissioning > Maintenance > Diagnostics > Self-Test > Battery Self-Test > Run Test.
Wait for all tests to complete and check the results in the summary table.
If any of the tests have failed, see the table below for possible solutions:
Test Results
Solution
Charge failed
Check that the power and communication cables between the
battery and inverter are properly connected.
Discharge failed
Check that the power and communication cables between the
battery and inverter are properly connected.
Communication
Check that the communication cables between the battery and
inverter are properly connected.
Inverter switch is off
Switch the inverter ON/OFF/P switch to ON.
To show the last test results:
Select Commissioning > Maintenance > Diagnostics > Self-Test > Battery Self-Test > Show Last Results.
Setting up the Maximize Self-consumption (MSC)
1.
Access SetApp and select Commissioning > Power Control.
2.
Select Energy Manager > Energy Control > Maximum Self Consumption.
Support Contact Information
If you have technical queries concerning our products, please contact us:
http://https://www.solaredge.com/service/support
Before contact, make sure to have the following information at hand:
Model and serial number of the product in question.
The error indicated on the product mobile application LCD screen or on the monitoring platform or by the LEDs, if
there is such an indication.
System configuration information, including the type and number of modules connected and the number and length
of strings.
The communication method to the server, if the site is connected.
The product's software version as it appears in the ID status screen.

Other manuals for SolarEdge StorEdge SE10K-RWS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge StorEdge SE10K-RWS and is the answer not in the manual?

SolarEdge StorEdge SE10K-RWS Specifications

General IconGeneral
TopologyTransformerless
Max Efficiency98.3%
Dimensions540 x 315 x 260 mm
Noise Level< 50 dBA
Protection RatingIP65
Rated AC Power10000 W
AC Frequency50/60 Hz
Maximum Efficiency98.3%
Number of MPP Trackers1
Warranty12 years
AC Output Power10000 W
Operating Temperature Range-25°C to +60°C
AC Voltage230 / 400 Vac
Max Input DC Voltage480 V
Communication InterfacesEthernet, RS485, ZigBee (optional)
Max Charge/Discharge Current25 A
Max Charge/Discharge Power10000 W
CommunicationEthernet, RS485, ZigBee (optional)