EasyManua.ls Logo

SolaX Power X3-Hybrid-10.0-D-E - Earth Connection(Mandatory)

SolaX Power X3-Hybrid-10.0-D-E
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Communication Connection Steps:
Ø
Step3. Insert the communication terminal into the BMS port.
Battery BMS module port(Pylontech: RS485 port; Triple Power: CAN port; Please
check the battery manual for more details).
Step1. Disassemble the BMS cable gland.
Step2. Prepare a communication cable(without sheath) and insert the commu-
nication cable through the cable nut.
Step1,2
6.6 Earth Connection(mandatory)
User can addtionally earth the inverter to the enclosure of a second earthing or
equipotential bonding if it is required by local safety. This prevents electric shock
if the original protective conductor fails.
Earth Connection Steps:
Ø
Step2. Place the ring terminal into the grounding rod and tighten the grounding
screw with a screwdriver.
Step1. Strip the earthing cable insulation and insert the stripped cable into the
ring terminal, then clamp it .
Electrical ConnectionElectrical Connection
36
37
Cable size: 12AWG.
ring terminal
Step1
Step2
B
M
S
Step3
Tighten torque:3.0Nm
Torque:1.5Nm

Related product manuals