EasyManua.ls Logo

SOMMER 800 User Manual

SOMMER 800
9 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
Issue 02 DEC.20
STRAIGHT PIVOT DOOR, CORNER
800, 900, 1000, 1200, 1400
Installation Instructions
Please read these instructions throughout before installing as incorrect tting will invalidate the guarantee.
If you are unsure about these instructions please contact Barwick Bathroom Distribution LLP 01274 687555.
HEALTH & SAFETY WARNING
DUE TO THE WEIGHT & SIZE OF THE GLASS PANEL(s) A MINIMUM OF TWO PERSONS ARE REQUIRED
TO MOVE AND INSTALL THIS ENCLOSURE
For the wall post and xings use only warm soapy water and damp cloth/ sponge
on a regular basis. After cleaning please rinse with clean water to remove any
residue.
Do not use abrasive scouring powders, chemicals or aerosol cleaners - these may
result in damage to the surfaces, in particular, the plated component parts.
The glass panels are pre-treated with a protective coating on the inside surfaces
only. Whilst this makes cleaning the glass easier and helps prevent the build up of
harmful lime-scale and soap deposits, the glass still needs to be maintained on a
regular basis. We recommend the use of a detergent and aroma free glass cleaner
(A 50/50 mix of white vinegar and water works well)
DO NOT use strong detergents, abrasive cleaners or abrasive scrubbing
equipment for cleaning, these can damage the coating.
DO use a squeegee to remove remaining droplets of water from glass after
showering, any build up of residue can be removed easily using an appropriate
cleaner and agitation from soft cleaning equipment
Cleaning - General
Glass Treatment
Important
Check appearance of all product - any defects must be reported to your retailer
before assembly/installation. Claims for imperfections will only be accepted prior
to assembly/installation.
Any claims made under the terms of the Lifetime Guarantee
must be reported to your retailer within 21 days of the fault occurring
Check the enclosure adjustment sizes are suitable for your installation.
Use care when drilling into the walls to avoid hidden pipes or electric cables.
Stage 2
silicone sealant
Stage 1
Shower Tray
Ensure the top of shower tray is
LEVEL in ALL directions.
Once the tray is installed but
before the wall tiles are tted, any
gap between the tray and the walls
must be lled with silicone sealant
ush with the top of the tray.
Once the walls have been tiled but
before the enclosure is installed,
the tiles must be silicone sealed to
the tray all of the way around in
one continuous bead.
Failure to follow these
instructions will result in
leakage problems.
THESE INSTRUCTIONS ARE TO BE LEFT
WITH THE CONSUMER
Tools Required
www.sommershowers.co.uk
Hacksaw
Spirit Level
7mm Masonry Drill Bit
Pozi-head Screwdriver
Clear Silicone Sealant
Drill (Battery or Mains)
Tape Measure
Scissors
Pencil
Question and Answer IconNeed help?

Do you have a question about the SOMMER 800 and is the answer not in the manual?

SOMMER 800 Specifications

General IconGeneral
BrandSOMMER
Model800
CategoryPlumbing Product
LanguageEnglish

Summary

Health and Safety

Two Person Installation Requirement

Warning: Minimum of two persons required for moving and installing the glass panel(s) due to weight and size.

Cleaning and Maintenance

General Cleaning

Clean wall posts and fixings with warm soapy water and a damp cloth. Rinse with clean water.

Glass Treatment and Care

Maintain pre-treated glass with specific cleaners; avoid abrasive products and equipment.

Important Installation Guidance

Pre-Assembly Checks and Claims Policy

Report defects before assembly. Guarantee claims require reporting within 21 days of fault occurrence.

Site Preparation and Drilling Safety

Check enclosure sizes suit installation and exercise caution when drilling to avoid hidden utilities.

Shower Tray Installation Precautions

Tray Leveling and Sealing (Stage 1)

Ensure the shower tray is level and seal gaps between tray and walls before tiling.

Tile Sealing to Tray (Stage 2)

Seal tiles to the tray with a continuous silicone bead after tiling, before enclosure installation.

Product Specifications

Parts Identification

Component Breakdown

Lists parts for the door pack, inline panel, and side panel for corner enclosures.

Core Installation Steps

Step 1: Determine Door Handing

Configure the door assembly for either left or right-hand opening.

Step 2 & 3: Wallpost Positioning and Drilling

Mark and drill wallposts accurately, ensuring correct positioning and depth for mounting.

Step 4: Fixing Wallposts

Securely attach the wallposts to the wall using the provided screws.

Step 5 & 6: Side Panel Fitting

Attach bottom trim to side panel, then fit the panel into the wallpost, ensuring verticality.

Step 7 & 8: Seals and Door Preparation

Insert push-in seal and prepare the installation area for the door assembly.

Step 9 & 10: Door Assembly Installation

Slot the door assembly into the wallpost, secure it, and adjust as needed.

Step 11, 12 & 13: Inline Panel Trim and Seals

Fit trim to inline panel, install glass-to-glass seal, and prepare for inline panel insertion.

Step 14: Fitting the Inline Panel

Carefully insert the inline panel into the corner seal, ensuring alignment and squareness.

Step 15 & 16: Stabiliser Rail Installation

Measure, cut, trim, and securely fit the stabiliser rail to the enclosure.

Step 17, 18, 19 & 20: Door Seals and Spacing

Prepare door seals, attach them, check glass spacing, and install magnetic seals.

Step 21, 22 & 23: Handle and Finishing Touches

Fit the handle, wallpost end caps, and screw mouldings for a complete installation.

Step 24 & 25: Final Sealing and Water Threshold

Apply silicone sealant to critical areas and fit the water threshold strip and end caps.

Step 26: Curing Period

Allow 24 hours for the silicone sealant to fully cure before using the shower.