Do you have a question about the SOMMER 800 and is the answer not in the manual?
Brand | SOMMER |
---|---|
Model | 800 |
Category | Plumbing Product |
Language | English |
Warning: Minimum of two persons required for moving and installing the glass panel(s) due to weight and size.
Clean wall posts and fixings with warm soapy water and a damp cloth. Rinse with clean water.
Maintain pre-treated glass with specific cleaners; avoid abrasive products and equipment.
Report defects before assembly. Guarantee claims require reporting within 21 days of fault occurrence.
Check enclosure sizes suit installation and exercise caution when drilling to avoid hidden utilities.
Ensure the shower tray is level and seal gaps between tray and walls before tiling.
Seal tiles to the tray with a continuous silicone bead after tiling, before enclosure installation.
Lists parts for the door pack, inline panel, and side panel for corner enclosures.
Configure the door assembly for either left or right-hand opening.
Mark and drill wallposts accurately, ensuring correct positioning and depth for mounting.
Securely attach the wallposts to the wall using the provided screws.
Attach bottom trim to side panel, then fit the panel into the wallpost, ensuring verticality.
Insert push-in seal and prepare the installation area for the door assembly.
Slot the door assembly into the wallpost, secure it, and adjust as needed.
Fit trim to inline panel, install glass-to-glass seal, and prepare for inline panel insertion.
Carefully insert the inline panel into the corner seal, ensuring alignment and squareness.
Measure, cut, trim, and securely fit the stabiliser rail to the enclosure.
Prepare door seals, attach them, check glass spacing, and install magnetic seals.
Fit the handle, wallpost end caps, and screw mouldings for a complete installation.
Apply silicone sealant to critical areas and fit the water threshold strip and end caps.
Allow 24 hours for the silicone sealant to fully cure before using the shower.