EasyManua.ls Logo

Sony CCP-8000 - 2 Installation; Installation Tasks

Sony CCP-8000
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-1
MVS-8000 System
SYSTEM SETUP
Section 2
Installation
2-1. Installation Tasks
Installation tasks should be completed in the following order:
1. Unpack equipment
2. Install the CCP-8000 main panel, the Menu Panel (MKS-8011) and the AUX panel (separate unit
only) and System Control Unit (MKS-8010).
3. Install the switcher processor, DME processor, and DCU.
4. Connect cables and configure internal system communications (including Ethernet and IP address.)
5. Connect cables to video inputs and outputs, DME V/K.
6. Connect the power cables.
7. Test that the power supply system works correctly and communications are established correctly in
the system.
8. Test basic system for proper operation
9. Cable external interface (including Tally and GPI).
10. Configure external interface.
11. Test external interfaces for proper operation

Other manuals for Sony CCP-8000

Related product manuals