INSTRUCTION AND SERVICE PARTS MANUAL - FREEZER CS 800, s/n F0176-00 - ALFRED & CO
L2
9.3. PRODUCTION
9.3.1. START-UP PROCEDURE (see “FRONT PANEL”)
• Turn on the main power switch (pos. 32), push the reset button (pos. 31)
and wait at least four hours before starting to allow the electric heater
inside the compressor warm up the oil.
• If not, there will be oil entrainment problems at compressor start up.
• Make sure that the condenser cooling water is on.
• Remove the observation plug (pos. 27) from the observation port on the
front door.
• Switch on the mix pump button (pos. 3) which will also start the booster
pump (centrifugal pump). In case the booster pump has been wired
separately, start the buster pump first.
• Turn the “Production - C.I.P.” switch in the “Production” position (pos.
15) and switch on the button “Pump P1”.
• Continue to run the pumps until the product level in the inner cylinder
has reached the observation port.
• Stop the pumps (pos. 1)
• Replace the observation plug (pos. 27).
• Set the desired viscosity ( in % - max 100%) on the viscosity controller
(pos. 9). See Paragraph 9.3.4. “ Viscosity setting & adjustment “. The
set point entered by the operator appears in the display marked "w".
To obtain the desired product stiffness, control the refrigeration pressure
by turning the manual refrigeration control counter-clockwise or
clockwise (pos. ..).
• Set the overrun you desire (in %) on the overrun controller (pos. 7). See
Paragraph 9.3.2. “ Overrun setting & adjustment”. The set point entered
by operator appears in the display marked “w”.
• Set the desired cylinder pressure (in bar) on the cylinder pressure
controller (pos. 8). See Paragraph 9.3.3. “Cylinder pressure setting &
adjustment” . The set point entered by the operator appears on the
display marked “w”.
• Start the dasher by pushing the dasher start button (pos.4).
• Start the refrigeration by pushing the refrigeration start button (pos. 14).
• Start the pumps by pushing the pumps start button, when the dasher
motor load indicator (Display XS) will reach 60-70 % of the dasher motor
load (machines with series 80 ( solid ) dasher must have product
flowing through the inner cylinder before refrigeration
commences). At the same time start the booster pump.
• The safety device (stall monitor) which controls the max dasher motor
load, is pre-set at the factory.