EasyManua.ls Logo

Söring SONOCA 185 - 5.4.2 Connecting the irrigation tubing to the instrument

Söring SONOCA 185
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
DocNr.: 03-4655 R03.01 | 22.09.2015 | en-US | Ultrasonic Generator 23
Connecting instruments
Requirements
The ultrasonic generator is turned on.
The instrument and instrument cable have been sterilized.
Procedure
1. Insert the instrument cable into the connector socket on the instrument.
Observe the markings.
The instrument cable engages in the connector socket.
2. Fully insert the instrument cable into the connector socket on the ultrasonic gen-
erator.
Observe the markings.
–The OK indicator light on the ultrasonic generator goes on.
5.4.2 Connecting the irrigation tubing to the instrument
Requirements
The instrument cable is connected to the instrument.
The irrigation tube has been sterilized.
Procedure
1. Connect the irrigation tubing with the luer lock port or instrument irrigation.
Hand tighten only.
The irrigation tubing is connected to the instrument.
out.fm Seite 23 Dienstag, 22. September 2015 3:24 15

Table of Contents

Related product manuals