83
ELECTRIC PANEL
BSS-134
CHAP.- 8
T81 Delay Start Signal = This value can be specifi ed for the upstream machine response delay.
T82 Delay End Start Signal = This value can be entered for the upstream machine response signal
end. in particular it is the time needed for product release from the closed pliers not to
knock out the bottom of a package.
T83 Delay Required Discarge = It is the time needed for the pliers to close so that products reach the
package bottom when the pliers are closed.
T84 Welding Vertical = It is the time needed for a vertical sealing operation.
T85 = free option.
T86 Welding Horizontal = It is the time needed for a horizontal sealing operation in the pliers.
T87 Air Blast Horizontal = It is the time needed for the blower to cool the horizontal sealing.
T88 TIME HOPPER RUN = It is the time needed for the hopper to move (if BSS-134 is equipped
with a hopper).
Press on page 20 to access page 21 (this page is linked to each program saved to
memory).
IF YOU ENABLE THE SETTINGS OF MACHINE CYCLE TIME VALUES.
N.B.= IT IS A GOOD RULE TO ENTER TIME VALUES ONE BY ONE AND CHECK FOR FOR THE
OPERATING EFFECTS.